Testing Scope
Functional Testing
• PCB-level validation (continuity, signal integrity, component checks)
• Arc detection accuracy verification
• LoRa (Mesh) communication and signal stability tests
Performance Testing
• Power consumption analysis in active and sleep states
• Battery endurance testing under simulated load
• Environmental qualification:
- Temperature: –40°C to +85°C
- Vibration and shock resilience
Communication Testing
• Uplink/downlink reliability testing across environments
• ADR performance validation
• Packet delivery and network stability checks
Certification Pre‑Compliance
• CE pre‑compliance (EMC, EMI, electrical safety)
• WPC conformity for LoRa (Mesh) transmission power & spectrum
• RF shielding and performance verification
Field Testing
• Duration: 45‑day field deployment (Client Scope)
• Real‑world arc detection accuracy validation
• Signal strength and packet‑loss evaluation
• Battery performance monitoring in live conditions
• Weekly reports: performance metrics, issues, customer feedback
Bill of Materials (BoM) Optimization
- Prototype-stage BoM preparation
- Cost and component availability evaluation
- Post–field test BoM optimization for cost reduction
Certification and Compliance
CE Certification
- EMC, EMI, and electrical safety compliance (CE pre‑certification)
WPC Certification
- LoRa (Mesh) transmission power and spectrum compliance checks
IP67 Rating (Not in Scope)
- Dust and water ingress protection (IP67) — Not included in current scope